Projects

Industrial/Manufacturing

Omnicare

Project Image 1 Project Image 2 Project Image 3 Project Image 4 Project Image 5

2 Technology Drive Peabody, MA 01960

55,000 Square Feet

Vantage Builders completed a 55,000 square foot renovation project for Omnicare, Inc. at 2 Technology Drive in Peabody, Mass.  The $1.3 million project included the creation of new office, pharmacy and shipping/receiving space for the Ohio-based Fortune 500 company. 
 
Omnicare, which provides comprehensive pharmaceutical services to patients and providers across the United States, hired Vantage after signing a lease at 2 Technology Drive.  The building, which had been vacant for several years, had been configured primarily as a warehouse facility.  To support its plans to expand operations in Massachusetts’ North Shore area, however, Omnicare also needed office and pharmacy space.  
 
“The twist on this project was to transform the long-vacant warehouse into functional, multi-purpose space,” said Ed Silva, principal, Vantage Builders.  “Working closely with Omnicare, we were able to determine their needs and translate them into an efficient layout that will support their business strategy.”  
 
The first phase of the project was a full interior gut of the building, including the removal of pre-existing offices and structural walls.  The work included completely new electrical distribution and lighting, mechanical and plumbing work, and new VCT flooring. 
 
The office build-out encompasses 16,000 square feet of space and created a dozen new offices and room for dozens of cubicles.  The area also includes a lunch room and a high-tech training center with room for 40 trainees.  
 
Vantage also installed a new HVAC system, which provides critical air flow and temperature control for the pharmaceutical services company.  The HVAC features twelve new roof top units, ranging from three-tons to 15-tons, as well as a duct sock system throughout, which was easier to install and has quieter operation than traditional metal ductwork.  
 

recent projects

all projects

Strategic Spaces

280 Summer Street, Boston, MA

Reward Gateway

141 Tremont Street, Boston, MA

testimonials

all testimonials
Right from the beginning of the project, Vantage Builders stood out from the rest. During the bid phase, the level of involvement and attention to detail that Vantage brought to the table was noted. From the start, Ed Silva gave our team a comfort level that not only did he know what we were looking for, but that from the top down everyone at Vantage Builders knew as well. It was refreshing to see the owner of the company playing such a large role and having such a positive presence on this project. It was this involvement that allowed the project to move quickly and stay under budget. Robert DiFazio, President Critical Solutions Group

Our Mission

Our Mission is to build a trusted and dependable construction company that services the New England marketplace. Vantage Builders supports these goals by managing our business with integrity, investing in our employees' development, and exceeding the expectations of our clients



latest news

all news
Vantage Builders Constructs Facility Expansion for KORSCH America

 
  Facility Is Adjacent to Company’s North American Headquarters in South Easton, Mass.   WALTHAM, MASS. – January 23, 2018 – Vantage Builders, Inc., a general ... read more

Strategic Spaces Opens New Headquarters And Showroom In Boston

 
Chooses Vantage Builders to Renovate Space at 280 Summer St. in Seaport District   WALTHAM, MASS. – January 9, 2018 – Vantage Builders, Inc., a general contracting and construction ... read more